OfficeJang - Everything your office needs
English

Office move-out

When leaving an office, check reinstatement scope first.

Define demolition, restoration, asset disposal, and waste scope from the contract and move-in condition, then prepare the move-out schedule and inspection.

Calculate expected requirements first

Decision guide

What to do now

Align decision order and completion criteria first to reduce omissions.
  1. 01

    Compare contract and site

    Collect the lease, special clauses, pre-move-in records, and alteration history, and confirm restoration standards with the landlord.

  2. 02

    Separate assets and construction

    Separate assets for moving, sale, and disposal from demolition and restoration work, and assign work sequences and owners.

  3. 03

    Inspection and handover

    Check construction completion, meter readings, and handover of keys and documents, and record corrections and agreements.

Cost factors

Conditions affecting costs

Align quotation assumptions and separately charged scope before comparing totals.

Reinstatement obligations

The pre-move-in condition, landlord agreement, and systems allowed to remain determine actual work scope.

Demolition and waste items

Quotes reflect finish and equipment materials, dismantling difficulty, and furniture and waste quantities.

Move-out schedule

Equipment removal, building work hours, material availability, and landlord inspection timing affect the work schedule.

Preparation

Preparation tools

Organize conditions and checks before consultations to receive proposals on the same basis.

Vendor checks

How to check providers

Verify actual work scope and responsibilities rather than displayed numbers or promotional wording.

Basic information and actual provider

Check business details, who actually performs the work, and the responsible contact so consultation and site responsibilities align.

Industry qualifications and insurance

If licenses, qualifications, or insurance are required, verify their existence and scope through documents before signing.

Quote scope and change standards

Record inclusions, exclusions, schedule, extra-work approvals, and defect response standards in the same document.

Once your next steps are clear

Start consulting suitable providers.

Leave your request details so providers can be compared against your organized scope and schedule.
Get free comparison quotes

FAQ

Frequently asked questions

Who decides the reinstatement scope?

The landlord and tenant should agree based on the contract and move-in condition. It is best to mark the scope on drawings and photos and retain a record.

What comes first: demolition or used furniture disposal?

Remove assets for sale and reuse first, then demolish fixed furniture and finishes to reduce asset damage and work conflicts.

What if corrections are requested at the move-out inspection?

Compare the agreed completion criteria and site records, distinguish defects from additional requests, and define responsibilities and timing in writing.