Leased premises
Check that the address, building, floor, unit, private and common spaces, and parking, storage, and signage rights in the lease match the site explanation. Distinguish leased area from exclusive-use area and attach drawings.
- Exact address and unit of the leased premises
- Exclusive-use and common areas and available ancillary spaces
- Parking, storage, signage, and visitor conditions
- Handover date and actual move-in and construction start dates
Reinstatement clauses
The word 'reinstatement' alone does not define the return condition. Specify the move-in condition, facilities the tenant will install, items the landlord wants retained, demolition and repair responsibilities, and inspectors.
Keep dated pre-move-in photos and videos, drawings, and facility handover records, and link work approvals to the contract documents.
- Reference date and supporting records for reinstatement
- Items to remove, retain, or repair
- Responsibility for waste and system disconnection costs
- Pre-move-out inspection and correction verification methods
Construction approval and building rules
Confirm permitted interior work, design approvals, and coordination contacts for fire safety, electrical, and HVAC work. Management office rules for work applications, protective coverings, elevators, vehicles, work hours, noise, and dust also affect costs and schedules.
- Landlord and building construction approval procedures
- Required checks for permitted use, evacuation, fire safety, and equipment
- Permitted work days and hours and protection of common areas
- Designated contractors or building-side work scope and costs
Utilities and documents
Beyond rent, check management charge items and settlement standards and how electricity, water, HVAC, and parking fees are calculated. Read overdue payment, renewal, early termination, deposit return, insurance, and liability terms against realistic scenarios.
- Check ownership, authority, and registry details
- Deposit, rent, maintenance charges, VAT, and payment dates
- Metering and settlement standards and handling of pre-move-in arrears
- Renewal, termination, assignment, subletting, and deposit return conditions
- Copies of the lease, special clauses, drawings, building rules, and handover records