OfficeJang - Everything your office needs
English

Reinstatement

Office reinstatement scope: what should you check first?

How to agree on demolition and restoration scope using the contract, move-in condition, and alteration approval records.

The answer first

Key answer

Reinstatement means meeting the return condition defined by the contract and agreement, rather than automatically making the space brand new. Compare the lease and special clauses, move-in photos and drawings, work approvals, and the landlord's or manager's latest requirements together. Without written agreement on removal, retention, repairs, and inspection methods before work begins, disputes over scope and costs may arise at completion.

Documents that define the scope

Read reinstatement wording alongside the premises description, tenant-installed facilities, landlord-approved work, and termination and handover clauses. If move-in photos and handover records exist, compare them with the current condition.

Legislation provides general principles but does not automatically determine the specific obligations at an individual site. If wording is unclear or amounts are large, take the contract documents to a legal professional.

On-site agreement checklist

Number items on drawings or photos so the landlord, manager, and contractor refer to the same objects.

  • Whether partitions, ceilings, floors, paint, and signs will be removed or retained
  • Restoration standards for electrical, telecom, HVAC, and fire safety systems
  • Responsibilities for furniture, equipment, and waste removal and building removal rules
  • Permitted work hours, protective coverings, elevator use, and complaint handling
  • Who performs interim and final inspections and how corrections are verified

Items easily omitted from quotes

A demolition total may exclude waste transport and disposal, common-area protection, night work, system disconnection and reconnection, and post-inspection corrections. Mark quantities and inclusion status for each item.

Calculations before a site survey are not fixed construction prices. Hidden wiring and equipment conditions and building work rules in particular may change after inspection.

Keep completion records

Keep inspection photos from before and after, correction requests and results, key and access card returns, meter checks, and the handover certificate together. A verbal completion notice alone is difficult to verify later.

Sources and limitations

The official materials below are starting points for verification. Scope and procedures may vary by situation and effective date. Check the latest original documents and guidance from the responsible authority.

NEXT STEP

Next step

  • Enter restoration scope and site conditions to explore a preliminary range.
  • Check reinstatement and construction approval wording at the contract stage.