I'm closing an office
Reinstatement: compare the lease with the handover condition before starting work.
Finalize the required reinstatement scope using lease documents, move-in records, and agreement with the landlord.
View all servicesDecision guide
When you may need this
Reinstatement means meeting move-out requirements based on the pre-move-in condition, contractual obligations, and landlord agreement, rather than rebuilding everything as new.
When restoring to move-out requirements
Consider this when reinstatement must be completed before move-out based on the lease and the condition at move-in.
When agreeing on scope with the landlord
Needed to reduce disputes by documenting demolition and repair scope with the landlord and building management.
When inspection is needed before deposit settlement
Suitable for checking completed work and additional correction requests before settling the deposit.
Work scope
Typical work scope
Before requesting proposals, separate included work from responsibilities assigned to other providers.Establish the standard
Compare the lease, special clauses, move-in drawings and photos, and records of alterations.
Demolition and reinstatement
Remove agreed installations and restore finishes, systems, and damaged areas to the specified condition.
Inspection and handover
Inspect the site with the landlord or management and record corrections and completion.
Cost factors
Conditions affecting costs
Align the factors causing quote differences and compare them item by item.Reinstatement standard
The move-in condition and scope agreed with the landlord determine actual work items.
Alteration history
Costs reflect the extent of changes to partitions, flooring, ceilings, electrical and fire safety systems, and HVAC.
Site and schedule
Material availability, building work conditions, and the move-out deadline affect the work sequence.
Preparation
Information and documents to prepare
Preparing these before consultation helps define site checks and quote scope more precisely.Lease and handover records
Collect the contract and special clauses, pre-move-in photos, drawings, and construction approval records.
Site agreement
Confirm reinstated and retained items, finish standards, and the inspector with the landlord in writing.
Move-out schedule
Define the sequence for removing equipment, canceling services, construction, inspection, and key handover.
Vendor checks
What to check when choosing a provider
Check documented responsibility scope and change and defect handling alongside experience.Contract-based survey
Check whether the provider reviews the contract and move-in records together rather than giving a blanket quote based only on the site.
Detailed quote
Check that demolition, finishes, systems, disposal, protection, and separate work are itemized.
Inspection support
Confirm coverage for attending the landlord's inspection, corrective work, and completion documentation.
Related tools
Related tools and services
Explore services and calculators that should be considered alongside this work.Reinstatement Preparing for a consultation?
Start by defining the scope and conditions together.
Use your prepared materials to begin comparative consultations with suitable providers.FAQ
Frequently asked questions
Is reinstatement complete if we demolish the entire office?
Depending on the lease and move-in condition, some systems may need to remain and some finishes may need to be rebuilt. Prior agreement is necessary.
What if we have no pre-move-in photos?
Use contract documents, building drawings, construction approval records, and an on-site check with the landlord to establish written reinstatement standards.
Why do reinstatement quotes vary so much between providers?
Restoration scope, finish specifications, and inclusion of equipment and disposal may differ. Compare items against the same scope matrix.